TMS Mooring platform for London City Airport
16/10/2018
TMS undercarriage for 300 tons crawler crane
19/12/2018

TMS Limped dams

Dry working under water; TMS designed and construct 4 limped dams for the purpose of working dry under water on steel piles. This is achieved by means of a basin from which the upper edge is just above the water level and on the bottom it is sealed by an inflatable seal.