Extended MODIGA delivered

Five new hose reels delivered
08/01/2024
Two ship loader cranes delivered
14/05/2024

Extended MODIGA delivered

The Monopile Drilling, Installation and Grouting Aid (MODIGA) designed and built by TMS in 2021, has been converted for use on a new project following a successful project. This conversion included a 10-metre extension and an update of the existing systems.

The tool is now able to be used for drilling diameters of Ø 7.7 m, at water depths of 42.26 m.