TMS New design special portal undercarriage

760 tons wireless remote operated lifting beam delivered
23/02/2021
New oil skimmer crane delivered
13/04/2021

TMS New design special portal undercarriage

TMS designed and calculated a special excavator undercarriage gantry for a project on the Afsluitdijk. This undercarriage is designed to work with the excavator horizontal and gantry at an angle of 14.5º. The span distance between the tracks is hydraulically adjustable till a max. span of 20 meters. This undercarriage has been taken into use for the project on the Afsluitdijk.