Modification bow lifting cranes

New stern ramp
14/02/2022
2 New oil skimmer cranes
09/05/2022

Modification bow lifting cranes

TMS has delivered modifications for the bow lifting cranes of an existing ship. In order to increase headroom below lifted Bow with 3 meter till 15 meters, and increase clearance between pedestals with 1 meter to a width of 10,5 meter to allow higher and  wider Nacelle’s and Cranes to passing the ramp during loading-unloading vessel.

The weight of nacelle’s are increased also, therefore TMS engineered/calculated reinforcements on the ramp which have to be done in order to withstand a load of more than 1000 metric ton!