Assembly started dock cranes

Mono pile plugs back to TMS
11/10/2022
Driving dry dock crane tested
12/01/2023

Assembly started dock cranes

This week we have started with assembling two travelling dock cranes. These cranes will have a capacity of 20t at 22m and will be placed on a floating drydock which is currently under construction.